Design an entire content operation — advantage, pillars, production, distribution and pruning — sized to real capacity.
Content Creation
You are designing a complete content operation for . Most content programmes fail not from bad writing but from an unsustainable system: too ambitious a cadence, no distribution, no pruning, and no genuine advantage. This designs the system.
## Brief
- Company: Northpath — workflow tools for creative teams
- Product: A project management tool for creative agencies
- Audience: Heads of marketing at 20–200 person B2B SaaS companies
- Problem solved: Scope creep going unnoticed until the project is unprofitable
- Proof available: 31% reduction in write-offs within two quarters
- Capacity: One person, two days a week
- Voice: Direct, practical, dry humour; never hypey
- Constraint: Under £5,000 and no dedicated designer
---
## Phase 1 — Establish the unfair advantage
Content without an advantage is a commodity, and commodity content now competes with infinite machine-generated output. Establish what Northpath — workflow tools for creative teams has that others do not:
- **Proprietary data** — what does running this business let you measure that nobody else can?
- **Operational experience** — what have you done that most of the audience has not?
- **Customer access** — what do you learn from customers that is not public?
- **A real position** — what do you believe that most of the industry does not?
- **Willingness** — what will you say that competitors will not, for reasons of caution?
Be rigorous. "We understand our customers" is not an advantage. If none of these is genuinely present, say so plainly — the first task is acquiring one, not publishing.
**CHECKPOINT 1** — Present the advantage assessment. Stop.
---
## Phase 2 — Define the territory and the exclusions
- What should Northpath — workflow tools for creative teams be known for? Narrow enough to plausibly own within a year.
- What adjacent topics are you deliberately not covering?
- Who is the content explicitly not for?
Then define three or four pillars. For each: what it covers, why you are credible, what the reader gets, and how it relates to A project management tool for creative agencies without being about it.
---
## Phase 3 — Size the operation honestly
Work out what One person, two days a week actually supports:
- Time per piece, including research, writing, editing, visuals and distribution — most estimates omit everything but writing, which is often under half the total
- The realistic cadence, then reduced by 30% for reality
- The minimum you would commit to for twelve months
State the sustainable cadence. Then state the ambitious cadence and what would need to be true to reach it. Committing to the ambitious one is the single most common cause of programme death.
---
## Phase 4 — Design the production system
- **The idea pipeline** — where ideas come from, so the calendar is never filled by desperation. Specify actual sources: customer questions, support tickets, sales objections, community threads.
- **The quality bar** — a falsifiable test each piece must pass. For example: contains at least one thing unavailable in the first three search results.
- **The workflow** — from idea to published, with who does what and where it can stall.
- **The fallback** — what publishes when the planned piece is not ready.
- **The kill criteria** — when a piece in progress gets abandoned rather than finished out of sunk cost.
---
## Phase 5 — Design distribution as a first-class system
Most programmes treat distribution as an afterthought and then conclude that content does not work.
- Where Heads of marketing at 20–200 person B2B SaaS companies actually gathers, specifically
- The standard first-48-hours process, as a repeatable checklist
- The repurposing rules: which piece types produce which derivatives, and when
- The relationship-building that makes distribution easier over time — this compounds and is usually neglected
- The allocation: what proportion of One person, two days a week goes to distribution rather than production
**CHECKPOINT 2** — Present the production and distribution systems. Stop.
---
## Phase 6 — Measurement and pruning
- **The metric that matters** for this programme's goal, and the vanity metrics to ignore. Pageviews rarely answer the question being asked.
- **The realistic timeline** — when to expect signal, stated honestly. Content programmes are routinely killed at month four because nobody set the expectation that month four looks like failure.
- **The quarterly audit**: which pieces to update, which to consolidate, which to delete. Pruning improves overall performance and almost nobody does it.
- **The stopping rule**: what result after what period would indicate this is the wrong channel for Northpath — workflow tools for creative teams.
---
## Phase 7 — The honest assessment
Close with:
- What this programme will realistically achieve in twelve months
- The single most likely cause of failure, given Under £5,000 and no dedicated designer
- What would have to be true for this to be the wrong investment entirely
- The one thing that, if you could only do it, would matter most
---
## Standing rules
- Never invent benchmarks, traffic figures or results. Use [NEEDS DATA].
- Recommend less volume wherever less would work. Over-production at low quality is the dominant failure mode.
- If the honest answer is that Northpath — workflow tools for creative teams lacks an advantage and should not run a content programme yet, say it directly.
## Avoid
- Opening with a definition, a rhetorical question, or "In today's fast-paced world".
- The words "delve", "tapestry", "landscape", "game-changer", "unlock", "elevate", "seamless", "robust", and the construction "it's not just X, it's Y".
- Padding: any sentence that restates the previous one in different words.
- Evenly-weighted sections. Real arguments have a centre of gravity.
- Hedging every claim into meaninglessness. Take a position.